The vibration-induced fatigue failure of small-bore piping is one of the common causes of failure trouble at nuclear power plants (NPPs). Therefore, the purpose of this study is to develop the measurement methods of vibration-induced stress for the screening to prevent from fatigue failure mechanism of small-bore piping. First, a measurement method using a single-mass model was introduced, and then, a measurement method using a two-mass model developed as an improved calculation model was proposed. These two kinds of models were validated by vibration tests using mock-up with small-bore branch piping. The results showed that the single-mass model could be used as the coarse screening. Additionally, the two-mass model was found to be suitable to the fine screening due to more accurate measurement of vibration-induced stress. Next, for small-bore piping with typical pattern configurations consisting of several masses and supports, the model considering the supports and the center of gravity being out of pipe centerline was developed and put into practical use. Finally, for the more complex small-bore piping with general piping configurations consisting of many bends, branches, or joints, the method based on the finite element analysis and using the measured values was developed. In the developed method, the differences between the natural frequency and the response acceleration obtained by the measurement and those values calculated using the analysis model are optimized to be enough small, and then, the vibration-induced stress is estimated by superposing the vibration modes of the small-bore piping with the static deformation representing the main piping vibration. In this study, the usability of the developed method was confirmed by the comparison with the numerical results without the measurement error, which were assumed to be the true values. The peak stress induced by vibration frequently occurs at the filet weld part between the small-bore piping and the main piping. The developed methods can be used for various weld geometries although the measurement method using strain gauges cannot be used for such weld parts. The failure possibility by vibration-induced fatigue can be evaluated by comparing the nominal stress measured by the methods in this study with the fatigue threshold stress divided by the stress concentration factor appropriate for the weld geometry.

References

1.
Bush
,
S. H.
,
1988
, “
Statistics of Pressure Vessel and Piping Failures
,”
ASME J. Pressure Vessel Technol.
,
110
(
3
), pp.
225
233
.
2.
Gamble
,
R. M.
, and
Tagart
,
S. W. J.
,
1991
, “
A Method to Assign Failure Rates for Piping Reliability Assessments
,”
ASME Pressure Vessels and Piping Conference
, San Diego, CA, June 23–27, Vol.
215
, pp.
3
12
.
3.
Bush
,
S. H.
,
1992
, “
Failure Mechanisms in Nuclear Power Plant Piping Systems
,”
ASME J. Pressure Vessel Technol.
,
114
(
4
), pp.
389
395
.
4.
Gosselin
,
S. R.
, and
Fleming
,
K. N.
,
1997
, “
Evaluation of Pipe Failure Potential Via Degradation Mechanism Assessment
,”
Fifth International Conference on Nuclear Engineering (ICONE 5)
, Nice, France, May 26–30, Paper No. ICONE-2641.
5.
Lydell
,
B. O. Y.
,
2000
, “
Pipe Failure Probability—The Thomas Paper Revised
,”
Reliab. Eng. Syst. Saf.
,
68
(
3
), pp.
207
217
.
6.
Moussou
,
P.
,
Cambter
,
S.
,
Lachene
,
D.
,
Longarini
,
S.
,
Pauthiac
,
L.
, and
Villouvier
,
V.
,
2001
, “
Vibration Investigation of a French PWR Plant Piping System Caused by Cavitating Butterfly Valves
,”
ASME Pressure Vessels and Piping Conference
, Atlanta, GA, July 22–26, Vol.
420-2
, pp.
99
106
.
7.
Lydell
,
B.
, and
Riznic
,
J.
,
2008
, “
OPDE—The International Pipe Failure Data Exchange Project
,”
Nucl. Eng. Des.
,
238
(
8
), pp.
2115
2123
.
8.
Park
,
J. S.
, and
Choi
,
Y. H.
,
2012
, “
Application of Piping Failure Database to Nuclear Safety Issues in Korea
,”
Int. J. Pressure Vessels Piping
,
90–91
, pp.
56
60
.
9.
Bauernfeind
,
V.
,
Bioem
,
Th.
,
Pache
,
W.
, and
Diederich
,
H. J.
,
1992
, “
Vibration Monitoring of the Primary Piping System During the Hot Functional Tests of the Mülheim-Kärlich PWR
,”
Nucl. Eng. Des.
,
133
(
1
), pp.
17
21
.
10.
Hofstötter
,
P.
,
1994
, “
In-Service Measurements on Piping Systems and Components in Nuclear Power Plants
,”
Nucl. Eng. Des.
,
147
(
3
), pp.
369
374
.
11.
Lu
,
N.
,
Wang
,
X.
, and
Xu
,
X.
,
2005
, “
Piping Vibration Stress Measurement and Life Assessment
,”
18th International Conference on Structural Mechanics in Reactor Technology
(
SMiRT 18
),
Beijing, China
,
Aug. 7–12
, Paper No. D03-8.
12.
Moussou
,
P.
, and
Boyelle
,
H.
,
1999
, “
Analysis of the Vibrations of a Complete French PWR Power Plant Piping System
,”
ASME Pressure Vessels and Piping Conference
,
Boston, MA
,
Aug. 1–5
, Vol.
389
, pp.
415
422
.
13.
Kostarev
,
V.
,
Tuomas
,
A.
, and
Reinsch
,
K. H.
,
2007
, “
Resolving of Steam and Feed-Water Piping Vibration Matter at Loviisa NPP
,”
19th International Conference on Structural Mechanics in Reactor Technology
(
SMiRT 19
), Toronto, ON, Canada, Aug. 12–17, Paper No. J02/4.
14.
Wachel
,
J. C.
, and
Bates
,
C. L.
,
1976
, “
Escape Piping Vibrations While Designing
,”
Hydrocarbon Processing
,
55
(
10
), pp.
152
156
.
15.
ASME
,
1991
, “
Requirements for Preoperational and Initial Start-Up Vibration Testing of Nuclear Power Plant Piping Systems
,” American Society of Mechanical Engineers, New York, Standard No. OMa-S/G-1991.
16.
Sukaih
,
N.
,
2002
, “
A Practical Systematic and Structured Approach to Piping Vibration Assessment
,”
Int. J. Pressure Vessels Piping
,
79
(8–10), pp.
597
609
.
17.
Tanaka
,
T.
,
Suzuki
,
S.
,
Nekomoto
,
Y.
, and
Tanaka
,
M.
,
1994
, “
The Development of a Diagnostic and Monitoring System for Vibrating Pipe Branches
,”
Nucl. Eng. Des.
,
147
(
3
), pp.
455
461
.
18.
Fujita
,
K.
,
Tanaka
,
M.
,
Nekomoto
,
Y.
, and
Oketani
,
K.
,
1995
, “
The Development of a Diagnostic and Monitoring System for Vibration Pipe Branches
,”
ASME Pressure Vessels and Piping Conference
, Honolulu, HI, July 23–27, Vol.
318
, pp.
109
114
.
19.
Kunze
,
U.
, and
Bechtold
,
B.
,
1995
, “
New Generation of Monitoring Systems With On-Line Diagnostics
,”
Prog. Nucl. Energy
.,
29
(
3/4
), pp.
215
227
.
20.
Okutsu
,
N.
,
1997
, “
Study on the Vibration and Stress of Copper Tubes in Refrigerators and Air Conditioners
,”
Trans. Jpn. Soc. Mech. Eng.
,
63
(
611
), pp.
2201
2205
.
21.
Wachel
,
J. C.
,
1995
, “
Displacement Method for Determining Acceptable Piping Vibration Amplitudes
,”
ASME Pressure Vessels and Piping Conference
,
Honolulu, HI
,
July 23–27
, Vol.
313-2
, pp.
197
208
.
22.
Moussou
,
P.
,
1999
, “
Maximum Speed and Displacement Criteria for a Vibrating Straight Nozzle
,”
ASME Pressure Vessels and Piping Conference
,
Boston, MA
,
Aug. 1–5
, Vol.
389
, pp.
341
348
.
23.
Finnveden
,
S.
, and
Pinnington
,
P. J.
,
2000
, “
A Velocity Method for Estimating Dynamic Strain and Stress in Pipes
,”
J. Sound Vib.
,
229
(
1
), pp.
147
182
.
24.
Moussou
,
P.
,
2002
, “
An Excitation Spectrum Criterion for the Vibration-Induced Fatigue of Small-Bore Pipes
,”
ASME
Paper No. IMECE2002-32847.
25.
Moussou
,
P.
,
2003
, “
An Excitation Spectrum Criterion for the Vibration-Induced Fatigue of Small-Bore Pipes
,”
J. Fluids Struct.
,
18
(
2
), pp.
149
163
.
You do not currently have access to this content.