We present an overview of recent research in the design and control of material handling systems. Research in both shopfloor transportation systems and storage systems is covered. The issues studied range from the integrated design of manufacturing facilities and material handling systems to the performance analysis of operating policies in these systems. In general, the design and control problems in material handling systems are very hard, but analytical results can be obtained for specific configurations and relaxations of the problem.

1.
Abdel-Malek
L.
, and
Tang
C.
,
1994
, “
A Heuristic for Cyclic Stochastic Sequencing of Tasks on a Drum-like Storage System
,”
Computers in Operations Research
, Vol.
21
No.
4
, pp.
385
396
.
2.
Abdou
G.
, and
Yang
M.
,
1995
, “
Multi-Layer Palletisation of Multi-Size Boxes
,”
The Journal of Advanced Manufacturing Technology
, Vol.
10
, pp.
292
297
.
3.
Adams
J.
,
Balas
E.
, and
Zawack
D.
,
1988
, “
The Shifting Bottleneck Procedure for Job Shop Scheduling
,”
Management Science
, Vol.
34
, No.
3
, pp.
391
401
.
4.
Armstrong
R.
,
Lei
L.
, and
Gu
S.
,
1994
, “
A Bounding Scheme for Deriving the Minimal Cycle Time of a Single-Transporter N-Stage process with Time-window Constraints
,”
European Journal of Operational Research
, Vol.
78
, pp.
130
140
.
5.
Bartholdi
J. J.
, and
Platzman
L. K.
,
1989
, “
Decentralized Control of Automated Guided Vehicles on a Simple Loop
,”
IIE Transactions
, Vol.
21
, No.
1
, pp.
76
81
.
6.
Be¨ngu
G.
,
1995
, “
An Optimal Storage Assignment for Automated Rotating Carousels
,”
IIE Transactions
, Vol.
27
, pp.
105
107
.
7.
Bilge
U¨.
, and
Ulusoy
G.
,
1995
, “
A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS
,”
Operations Research
, Vol.
43
, No.
6
, pp.
1058
1070
.
8.
Bozer
Y. A.
,
Cho
M.
, and
Srinivasan
M. M.
,
1994
, “
Expected Waiting Times in Single-Device Trip-Based Material Handling Systems
,”
European Journal of Operational Research
, Vol.
75
, pp.
200
216
.
9.
Bozer
Y. A.
, and
Srinivasan
M. M.
,
1991
, “
Tandem Configurations for Automated Guided Vehicle Systems and the Analysis of Single Vehicle Loops
,”
IIE Transactions
, Vol.
23
, No.
1
, pp.
72
82
.
10.
Bozer
Y. A.
, and
White
J. A.
,
1984
, “
Travel-Time Models for Automated Storage/Retrieval Systems
,”
IIE Transactions
, Vol.
16
, No.
4
, pp.
329
338
.
11.
Buckley, S. J., 1989, “Fast Motion Planning for Multiple Moving Robots,” Proc. of the 1989 IEEE International Conference on Robotics and Automation, The Registry Resort, Scottsdale, Arizona, pp. 322–326.
12.
Bulgak
A. A.
,
Diwan
P. D.
, and
Inozu
B.
,
1995
, “
Buffer Size Optimization in Asynchronous Assembly Systems using Genetic Algorithms
,”
Computers in Engineering
, Vol.
28
, No.
2
, pp.
309
322
.
13.
Canny
J.
,
1986
, “
Collision Detection for Moving Polyhedra
,”
IEEE Transactions on Pattern Analysis and Machine Intelligence
, Vol.
8
, No.
2
, pp.
200
209
.
14.
Chang
D.-T.
,
Wen
U.-P.
, and
Lin
J. T.
,
1995
, “
The Impact of Acceleration/Deceleration on Travel-Time Models for Automated Storage/Retrieval Systems
,”
IIE Transactions
, Vol.
27
, pp.
108
111
.
15.
Chung
Y.
, and
Fischer
G. W.
,
1995
, “
A Neural Algorithm for Finding the Shortest Flow Path for an Automated Guided Vehicle System
,”
IIE Transactions
, Vol.
27
, pp.
773
783
.
16.
Daniels, S. C., 1988, Real Time Conflict Resolution in Automated Guided Vehicle Scheduling. Ph. D. thesis, Department of Industrial Engineering, The Pennsylvania State University.
17.
Dowlatshahi
S.
,
1994
, “
A Modelling Approach to Design of Integrated Facilities
,”
International Journal of Production Research
, Vol.
32
, No.
6
, pp.
1313
1330
.
18.
Eben-Chaime
M.
,
1992
, “
Operations Sequencing in Automated Warehousing Systems
,”
International Journal of Production Research
, Vol.
30
, No.
10
, pp.
2401
2409
.
19.
Egbelu
P. J.
, and
Roy
N.
,
1988
, “
Material Flow Control in AGV/Unit Load Based Production Lines
,”
International Journal of Production Research
, Vol.
26
, No.
1
, pp.
81
94
.
20.
Egbelu
P. J.
, and
Tanchoco
J. M. A.
,
1986
, “
Potentials for Bi-directional Guide Path for Automated Guided Vehicle Based Systems
,”
International Journal of Production Research
, Vol.
24
, No.
5
, pp.
1075
1097
.
21.
Faraji, M., and Batta, R., 1993, Forming Cells to Eliminate Vehicle Interference and System Locking in an AGVS, Technical Report, Department of Industrial Engineering, State University of New York at Buffalo.
22.
Ferland
J. A.
, and
Fortin
L.
,
1989
, “
Vehicle Scheduling with Sliding Time Windows
,”
European Journal for Operational Research
, Vol.
38
, pp.
213
226
.
23.
Fuji, S., and Sandoh, H., 1987, “A Routing Algorithm for Automated Guided Vehicles in FMS,” Proceedings of the IXth International Conference on Production Research, Volume II, pp. 2261–2267.
24.
Grossman
D. D.
,
1988
, “
Traffic Control of Multiple Robot Vehicles
,”
IEEE Transactions on Robotics and Automation
, Vol.
4
, No.
5
, pp.
491
497
.
25.
Harhalakis
G.
,
Ioannou
G.
,
Minis
I.
, and
Nagi
R.
,
1994
, “
Manufacturing Cell Formation Under Random Product Demand
,”
International Journal of Production Research
, Vol.
32
, No.
1
, pp.
47
64
.
26.
Harhalakis
G.
,
Nagi
R.
, and
Proth
J. M.
,
1990
, “
An Efficient Heuristic in Manufacturing Cell Formation for Group Technology Applications
,”
International Journal of Production Research
, Vol.
27
, No.
9
, pp.
1465
1473
.
27.
Hwang
H.
, and
Ha
J.-W.
,
1991
, “
Cycle Time Models for Single/Double Carousel System
,”
International Journal of Production Economics
, Vol.
25
, pp.
129
140
.
28.
Hwang
H.
, and
Song
J. Y.
,
1993
, “
Sequencing Picking Operations and Travel Time Models for Man-On-Board Storage and Retrieval Warehousing System
,”
International Journal of Production Economics
, Vol.
29
, pp.
75
88
.
29.
Huang
J.
, and
Palekar
U. S.
,
1991
, “
Performance Evaluation of a Routing Algorithm for AGV Systems
,”
Transactions of NAMRI/SME
, Vol.
19
, pp.
345
351
.
30.
Huang
J.
, and
Palekar
U. S.
,
1992
, “
Geometry Considerations in the Routing of Automated Guided Vehicles
,”
Transactions of NAMRI/SME
, Vol.
20
, pp.
369
378
.
31.
Huang
J.
,
Palekar
U. S.
, and
Kapoor
S. G.
,
1993
, “
A Labeling Algorithm for Navigation of Automated Guided Vehicles
,”
JOURNAL OF ENGINEERING FOR INDUSTRY
, Vol.
115
, pp.
315
321
.
32.
Ilic`
O. R.
,
1994
, “
Analysis of the Number of Automated Guided Vehicles Required in Flexible Manufacturing Systems
,”
International Journal of Advanced Manufacturing Technology
, Vol.
9
, pp.
382
389
.
33.
Jaikumar
R.
, and
Solomon
M. M.
,
1990
, “
Dynamic Scheduling of Automated Guided Vehicles for a Certain Class of Systems
,”
Journal of Manufacturing Systems
, Vol.
9
, No.
4
, pp.
315
323
.
34.
Johnson, M. E., 1993, The Impact of Sorting Strategies on Automated Sortation System Performance, technical report, Owen Graduate School of Management, Vanderbilt University, Nashville, TN 37203.
35.
Johnson
M. E.
, and
Brandeau
M. L.
,
1993
, “
An Analytic Model for Design of a Multivehicle Automated Guided Vehicle System
,”
Management Science
, Vol.
39
, No.
12
, pp.
1477
1489
.
36.
Johnson
M. E.
, and
Brandeau
M. L.
,
1994
a, “
An Analytic Model for Design of a Single-vehicle Automated Guided Vehicle System
,”
Transportation Science
, Vol.
28
, No.
4
, pp.
337
353
.
37.
Johnson, M. E., and Brandeau, M. L., 1994b, Design of an Automated Shop Floor Material Handling System with Inventory Considerations, technical report, Owen Graduate School of Management, Vanderbilt University, Nashville, TN 37203 and Dept. of Industrial Engg. and Engg. Mgmt., Stanford University, Stanford, CA 94305–4024 resp. OGSM Working Paper.
38.
Johnson, M. E., and Brandeau, M. L., 1994c, Stochastic Modeling for Automated Material Handling System Design and Control, technical report, Owen Graduate School of Management, Vanderbilt University, Nashville, TN 37203 and Dept. of Industrial Engg. and Engg. Mgmt., Stanford University, Stanford, CA 94305–4024 resp.
39.
Knapp
G. M.
, and
Wang
H.-P. B.
,
1992
, “
Modeling of Automated Storage/Retrieval Systems using Petri Nets
,”
Journal of Manufacturing Systems
, Vol.
11
, No.
1
, pp.
20
29
.
40.
Kouvelis
P.
,
Chiang
W.-C.
, and
Yu
G.
,
1995
, “
Optimal Layout Algorithms for Row Layout Problems in Automated Manufacturing Systems
,”
IIE Transactions
, Vol.
27
, pp.
99
104
.
41.
Krishnamurthy
N. N.
,
Batta
R.
, and
Karwan
M. H.
,
1993
, “
Developing Conflict-Free Routes for Automated Guided Vehicles
,”
Operations Research
, Vol.
41
, No.
6
, pp.
1077
1090
.
42.
Lee
M.-K.
,
1992
, “
A Storage Assignment Policy in a Man-On-Board Automated Storage/Retrieval System
,”
International Journal of Production Research
, Vol.
30
, No.
10
, pp.
2281
2292
.
43.
Leung
J.
,
1994
, “
Polyhedral Structure and Properties of a Model for Layout Design
,”
European Journal for Operational Research
, Vol.
77
, pp.
195
207
.
44.
Liao
T. W.
,
1994
, “
Design of Line-type Cellular Manufacturing Systems for Minimum Operating and Material-handling Costs
,”
International Journal of Production Research
, Vol.
32
, No.
2
, pp.
387
397
.
45.
Lin, J., Hoffner, J., and Groover, M., 1986, A Graphic Simulation Model for Designing Systems of Mobile Robots and Automated Guided Vehicles. Technical Report MS86-782, SME Robotics Research Conference, Scottsdale, Arizona.
46.
Lin
S.-C.
, and
Wang
H.-P. B.
,
1995
, “
Modelling an Automated Storage and Retrieval System using Petri Nets
,”
International Journal of Production Research
, Vol.
33
, No.
1
, pp.
237
260
.
47.
Lozano-Pe´rez
T.
, and
Wesley
M. A.
,
1979
, “
An Algorithm for Planning Collision-Free Paths Among Polyhedral Obstacles
,”
Communications of the ACM
, Vol.
22
, No.
10
, pp.
560
570
.
48.
Mahadevan
B.
, and
Narendran
T. T.
,
1994
, “
A Hybrid Modelling Approach to the Design of an AGV-based Material Handling System for a FMS
,”
International Journal of Production Research
, Vol.
32
, No.
9
, pp.
2015
2030
.
49.
Malmborg
C. J.
,
1994
, “
A Heuristic Model for Simultaneous Storage Space Allocation and Block Layout Planning
,”
International Journal of Production Research
, Vol.
32
, No.
3
, pp.
517
530
.
50.
Manda, B. S., and Palekar, U. S., 1993, “Collision-Free Routing in Automated Guided Vehicle Systems,” Proceedings of the 2nd Industrial Engineering Research Conference, The Westin Bonadventure, Los Angeles, pp. 510–514.
51.
Maxwell
W. L.
, and
Muckstadt
J. A.
,
1982
, “
Design of Automated Guided Vehicle Systems
,”
IIE Transactions
, Vol.
14
, No.
2
, pp.
114
124
.
52.
Menon
S. R.
,
Kapoor
S. G.
, and
Blackmon
R. B.
,
1988
, “
Navigation Planning for Mobile Robotic Devices in Modular Warehouses
,”
The International Journal of Advanced Manufacturing Technology
, Vol.
3
, No.
4
, pp.
47
62
.
53.
Noble
J. S.
, and
Tanchoco
J. M. A.
,
1995
, “
Marginal Analysis Guided Design Justification: A Materials Handling Example
,”
International Journal of Production Research
, Vol.
33
, No.
12
, pp.
3439
3454
.
54.
Pandit, R., and Palekar, U. S., 1993a, Job Shop Scheduling with Explicit Material Handling Considerations, Technical Report, Department of Mechanical and Industrial Engineering, University of Illinois at Urbana-Champaign.
55.
Pandit
R.
, and
Palekar
U. S.
,
1993
b, “
Response Time Considerations for Optimal Warehouse Layout Design
,”
ASME JOURNAL OF ENGINEERING FOR INDUSTRY
, Vol.
115
, pp.
322
328
.
56.
Raman, N., Talbot, F. B., and Rachamadugu, R. V., 1986, “Simultaneous Scheduling of Machines and Material Handling Devices in Automated Manufacturing,” Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems, pp. 455–465.
57.
Reveliotis, S. A., and Ferreira, P. M., 1996a, “An Analytical Framework for Evaluating and Optimizing the Performance of Structurally Controlled Flexible Manufacturing Systems,” 1996 IEEE International Conference on Robotics and Automation, Minneapolis, MN, pp. 864–869.
58.
Reveliotis
S. A.
, and
Ferreira
P. M.
,
1996
b, “
Deadlock Avoidance Policies for the Automated Manufacturing Cells
,”
IEEE Transactions on Robotics and Automation
, Vol.
12
, No.
6
, p.
845
857
.
59.
Shang
J. S.
,
1995
, “
Robust Design and Optimization of Material Handling in an FMS
,”
International Journal of Production Research
, Vol.
33
, No.
9
, pp.
2437
2454
.
60.
Sinriech
D.
,
1995
, “
Network Design Models for Discrete Material Flow Systems: A Literature Review
,”
International Journal of Advanced Manufacturing Technology
, Vol.
10
, pp.
277
291
.
61.
Welgama
P. S.
, and
Gibson
P. R.
,
1995
, “
A Hybrid Knowledge Based/Optimization System for Automated Selection of Materials Handling System
,”
Computers in Industrial Engineering
, Vol.
28
, No.
2
, pp.
205
217
.
62.
Wilson
H. G.
,
1977
, “
Order Quantity, Product Popularity, and the Location of Stock in a Warehouse
,”
IIE Transactions
, Vol.
9
, No.
3
, pp.
230
237
.
63.
Wong, E. K., and Fu, K. S., 1985, “A Hierarchical-Orthogonal Space Approach to Collision-Free Path Planning,” 1983 IEEE Conference on Robotics and Automation, St. Louis, MO, pp. 506–511.
This content is only available via PDF.
You do not currently have access to this content.