The Gas Turbine High Temperature Gas Cooled Reactor (GT-HTGR) power plant combines the existing design HTGR core with a closed-cycle helium gas turbine power conversion system directly in the reactor primary circuit. Unlike open-cycle gas turbines where the recuperative heat exchanger is an optional component, the high cycle efficiency of the nuclear closed-cycle gas turbine is attributable to a high degree to the incorporation of the recuperator (helium-to-helium) and precooler (helium-to-water) exchangers in the power conversion loop. For the integrated plant configuration, a nonintercooled cycle with a high degree of heat recuperation was selected on the basis of performance and economic optimization studies. A recuperator of high effectiveness was chosen because it significantly reduces the optimum pressure ratio (for maximum cycle efficiency), and thus reduces the number of compressor and turbine stages for the low molecular weight, high specific heat, helium working fluid. Heat rejection from the primary system is effected by a helium-to-water precooler, which cools the gas to a low level prior to compression. The fact that the rejection heat is derived from the sensible rather than the latent heat of the cycle working fluid results in dissipation over a wide band of temperature, the high average rejection temperature being advantageous for either direct air cooling or for generation of power in a waste heat cycle. The high heat transfer rates in the recuperator (3100 MWt) and precooler (1895 MWt), combined with the envelope restraints associated with heat exchanger integration in the prestressed concrete reactor vessel, require the use of more compact surface geometries than in contemporary power plant steam generators. Various aspects of surface geometry, flow configuration, mechanical design, fabrication, and integration of the heat exchangers are discussed for a plant in the 1100 MWe class. The influence of cycle parameters on the relative sizes of the recuperator and precooler are also presented. While the preliminary designs included are not meant to represent final solutions, they do embody features that satisfy many of the performance, structural, safety, and economic requirements.
Skip Nav Destination
Article navigation
April 1977
This article was originally published in
Journal of Engineering for Power
Research Papers
Heat Exchanger Design Considerations for Gas Turbine HTGR Power Plant
C. F. McDonald,
C. F. McDonald
General Atomic Co., Advanced Concepts Division, San Diego, Calif.
Search for other works by this author on:
T. Van Hagan,
T. Van Hagan
General Atomic Co., Advanced Concepts Division, San Diego, Calif.
Search for other works by this author on:
K. Vepa
K. Vepa
General Atomic Co., Advanced Concepts Division, San Diego, Calif.
Search for other works by this author on:
C. F. McDonald
General Atomic Co., Advanced Concepts Division, San Diego, Calif.
T. Van Hagan
General Atomic Co., Advanced Concepts Division, San Diego, Calif.
K. Vepa
General Atomic Co., Advanced Concepts Division, San Diego, Calif.
J. Eng. Power. Apr 1977, 99(2): 237-245 (9 pages)
Published Online: April 1, 1977
Article history
Received:
December 22, 1975
Online:
July 14, 2010
Article
Article discussed|
View article
Connected Content
Citation
McDonald, C. F., Van Hagan, T., and Vepa, K. (April 1, 1977). "Heat Exchanger Design Considerations for Gas Turbine HTGR Power Plant." ASME. J. Eng. Power. April 1977; 99(2): 237–245. https://doi.org/10.1115/1.3446278
Download citation file:
Get Email Alerts
Cited By
Shape Optimization of an Industrial Aeroengine Combustor to reduce Thermoacoustic Instability
J. Eng. Gas Turbines Power
Dynamic Response of A Pivot-Mounted Squeeze Film Damper: Measurements and Predictions
J. Eng. Gas Turbines Power
Review of The Impact Of Hydrogen-Containing Fuels On Gas Turbine Hot-Section Materials
J. Eng. Gas Turbines Power
Effects of Lattice Orientation Angle On Tpms-Based Transpiration Cooling
J. Eng. Gas Turbines Power
Related Articles
The Nuclear Closed-Cycle Gas Turbine (HTGR-GT)—Dry Cooled Commercial Power Plant Studies
J. Eng. Power (January,1981)
Ways to Increase Efficiency of the High-Temperature Gas Reactor Coupled With the Gas-Turbine Power Conversion Unit
J. Eng. Gas Turbines Power (September,2009)
An Efficient, Flexible Arrangement to Generate High Quality Process or Domestic Heat in Recuperative Gas Cycle Power Plants: Application to Helium Direct Cycle Nuclear Power Plants
J. Eng. Power (January,1979)
The Relationship of Power and Heat Production with Closed Cycle Gas Turbines
J. Eng. Power (April,1980)
Related Chapters
Studies Performed
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
Threshold Functions
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
The Special Characteristics of Closed-Cycle Gas Turbines
Closed-Cycle Gas Turbines: Operating Experience and Future Potential