Abstract

This paper deals with boiler-feedwater treatment for the 1400-psi topping installation at the Waterside Station of the Consolidated Edison Company of New York, Inc. On the basis of thermal economy, degasification, treating costs, and installation convenience, a cold-water carbonaceous-zeolite treating system was deemed preferable. The application of the Zeo-Karb system selected, its operation, and results obtained constitute the principal features of the paper.

This content is only available via PDF.
You do not currently have access to this content.