1-1 of 1
Keywords: repeated cycles of shutting in and opening
Close
Sort by
Journal Articles
Publisher: ASME
Article Type: Research Papers
J. Energy Resour. Technol. January 2023, 145(1): 013001.
Paper No: JERT-22-1169
Published Online: July 4, 2022
... analysis was performed, and annular pressure regulation steps were determined. The obtained results revealed that the developed prediction model met engineering accuracy requirements. In a high-pressure gas well, after repeated cycles of shutting in and opening the well for 19 times, gas column height...