1-5 of 5
Keywords: schedule
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Proc. ASME. ICONE28, Volume 3: Computational Fluid Dynamics (CFD); Verification and Validation; Advanced Methods of Manufacturing (AMM) for Nuclear Reactors and Components; Decontamination, Decommissioning, and Radioactive Waste Management; Beyond Design Basis and Nuclear Safety; Risk Informed Management and Regulation, V003T13A002, August 4–6, 2021
Paper No: ICONE28-64332
.... At present, the overhaul will be identified through the assessment to optimize fuel cycle of the FJS Power Plant is 18 months, that is, an the work schedule of the overhaul to ensure that the work overhaul is carried out every 18 months. During the overhaul schedule will not lead to excessive increase...
Proceedings Papers

Proc. ASME. ICONE18, 18th International Conference on Nuclear Engineering: Volume 6, 165-170, May 17–21, 2010
Paper No: ICONE18-29783
... proven, the constructability analysis about work sequence, detailed logic, activity duration, production rate and improvement of them during the process is worthy to study. AP1000 Containment Vessel Schedule Constructability Proceedings of the 18th International Conference on Nuclear...
Proceedings Papers

Proc. ASME. ICONE16, Volume 4: Structural Integrity; Next Generation Systems; Safety and Security; Low Level Waste Management and Decommissioning; Near Term Deployment: Plant Designs, Licensing, Construction, Workforce and Public Acceptance, 907-916, May 11–15, 2008
Paper No: ICONE16-48932
... 09 07 2009 Many industries are using skids, modules and prefabrications to enhance construction productivity, reduce schedules and thus reduce costs. The leaders in this regard are offshore oil and gas, chemical and refinery, ship building, etc. Atomic Energy of Canada Ltd. (AECL ®...
Proceedings Papers

Proc. ASME. ICONE10, 10th International Conference on Nuclear Engineering, Volume 2, 1051-1057, April 14–18, 2002
Paper No: ICONE10-22718
... of a project if short construction schedules are to be met. A project schedule of 48 months has been developed for the nth unit of NG (Next Generation) CANDU with a 42 month construction period from 1st Concrete to In-Service. An overall construction strategy has been developed involving paralleling project...
Proceedings Papers

Proc. ASME. ICONE12, 12th International Conference on Nuclear Engineering, Volume 1, 561-567, April 25–29, 2004
Paper No: ICONE12-49561
... 25 11 2008 The ACR-700 has been designed with safety, cost and schedule as major drivers. Early in the concept stage it was demonstrated that short construction schedules can be achieved by paralleling activities, using such techniques as extensive modularization, combined with open...